Facts were checked against the City of Toronto and Ontario sources linked below on November 17, 2026. Re-check the by-laws the week this goes live.
If you are planning a duplex, triplex, fourplex or other multiplex in Toronto, development charges are one of the first cost questions owners ask. Some summaries say the charges are simply waived. The rule is more precise than that, and it is written in the City's by-laws. This guide explains what is actually exempt, how the first unit and any suites are treated, and when charges are payable. It does not quote development-charge rates, which depend on unit type and timing. As of November 17, 2026, the City's published rate sheet is still the schedule effective June 26, 2025, because annual indexing is paused; By-law 1261-2026 sets the next index date at May 1, 2030.
For help on a specific lot, start with a free initial consultation with Kings Valley Homes, or call (647) 278-2494.
What are development charges, and when does a multiplex trigger them?
Development charges are fees the City of Toronto imposes on development and redevelopment to help pay for infrastructure. The City says you may have to pay them if you are constructing a new building, making an addition or alteration that increases the number of residential units, or changing the use of all or part of a building.
A house-to-multiplex conversion and a new multiplex both add dwelling units, so they sit inside that definition. That does not mean every added unit is charged at the full rate. Toronto's Municipal Code, Chapter 415, sets exemptions on top of the provincial Development Charges Act, 1997.
For the construction and permit path, see our multiplex development page and Can I build a 4-unit multiplex on my Toronto lot?. This post stays on the charges themselves.
What does By-law 845-2025 exempt on a Toronto multiplex?
By-law 845-2025, enacted July 24, 2025, replaced section 415-6 A (2) of the Municipal Code. Where a unit is not already exempt under the Development Charges Act, the by-law says development charges: shall not be imposed with respect to the second, third or fourth residential dwelling unit; and for the fifth or sixth residential dwelling unit, shall be reduced to zero dollars; provided there are no more than six residential dwelling units constructed on a single parcel of land.
The City's Development Charges Overview describes the same exemption for the second through sixth unit in developments of up to six units, effective July 24, 2025.
Two conditions matter. The relief is for units two through six, not for an unlimited building, and the first unit is not named as exempt. If the parcel has more than six residential units, this exemption does not apply in the way the by-law describes. Check the first unit, any demolition credit, and how the City will count every suite on the parcel.
Does the first unit still pay a development charge?
Usually, yes, unless another exemption or a redevelopment credit applies. Section 415-6 A (2) relieves units two through six where they are not already exempt under the Act. It does not say the first unit is free. On a conversion, that unit is often the existing house. Ask Toronto Building or Revenue Services how they will treat it on your lot.
How does a demolition or conversion credit work?
Chapter 415 includes a redevelopment reduction. For a residential building, development charges otherwise payable are reduced where a demolition permit was issued within the 60-month period immediately before a complete building permit application is submitted for the same land, or where a building is converted from one principal use to another on the same land. The reduction is calculated from the applicable charge and the number and type of dwelling units demolished or converted.
That credit can matter when you replace an existing house with a multiplex, but it is not automatic. Keep the demolition permit and ask the City to confirm the credit for your application.
How does the City count a garden or laneway suite?
By-law 845-2025 says a garden or laneway suite "that is the subject of a Development Charge Deferral Agreement for Ancillary Dwelling Units with the City through the Laneway and Garden Suite Development Charges Deferral Program shall not be included in calculating the total number of units on the parcel of land."
The suite is left out of the six-unit cap only if that deferral agreement is in place. A suite that is not under the program may still count toward the six units. If a suite is part of your plan, read the City's program rules and our laneway suites page, then ask the examiner how your suite will be counted. The parkland rule below is worded differently, so do not assume one answer covers both.
What about parkland dedication?
Parkland dedication is a separate Chapter 415 requirement, paid in land or cash toward parks. It is not a development charge, and the exemption is not identical.
By-law 269-2026, enacted March 26, 2026, replaced section 415-30 A (16). It exempts the creation of a second, third, fourth, fifth or sixth residential dwelling unit constructed within the primary residential building or an ancillary building, provided the exemption applies to developments of no more than six total residential dwelling units (or seven where one or more of the units is a garden or laneway suite) on a single residential parcel of land.
Parkland can therefore reach seven units where one or more units is a garden or laneway suite. The development-charge exemption is built around a six-unit parcel, with a deferral-agreement suite left out of that count. Check both rules for the same site.
Do provincial rules also exempt additional units?
Yes, in some cases, and they are narrower than Toronto's by-law. The Development Charges Act, 1997, subsections 2(3.2) and 2(3.3), exempts a second and third residential unit in existing or new detached houses, semi-detached houses and rowhouses, plus one unit in an ancillary building, when the conditions in those subsections are met. Toronto's by-law goes further for units two to six, but only where the parcel stays within the six-unit limit. Do not assume the Act alone covers a four-unit or larger multiplex.
When are development charges payable?
The City's Non-Rental Residential Development Charges page says that, effective November 3, 2025, development charges for non-rental residential developments, such as condominiums and freehold homes, must be paid in full before occupancy is granted. The payment trigger is the occupancy permit. If the project is under a Section 27 agreement, payment follows that agreement instead. Rental and institutional developments follow their own instalment schedules, with the first payment due upon occupancy. Ask the City which timing rule applies to your units.
What else might you pay besides City development charges?
You should also plan for a building permit and related trade permits, connections and zoning review, and tree permits where they apply. The City also collects education development charges for the Toronto Catholic District School Board. Do not assume the City's multiplex exemption covers those.
Toronto also has a time-limited Development Charges Reduction Program, added by By-law 1261-2026 on July 30, 2026. It applies only once a federal or provincial transfer payment agreement is fully executed and the permit and occupancy conditions in the by-law are met. As of November 17, 2026, the City still says additional information will be available once the agreement is received. We have not confirmed that the agreement is in force or that the program reaches the first unit of a house-form multiplex. Ask the City whether it applies to your permit; do not budget a discount unless the City confirms it.
Our design, permits and project management page outlines how we coordinate drawings and municipal submissions on a Toronto lot.
Do these rules apply in Markham, Richmond Hill and the rest of the GTA?
No. Each municipality sets its own development charges by-law, so Toronto's By-law 845-2025 does not apply outside the city. Markham permits up to three units as of right; its four-unit by-laws were vetoed on March 11, 2026, and that limit was still in place as of November 17, 2026. Richmond Hill permits four units under By-law 143-24. See our Markham and Richmond Hill pages, then confirm with those cities.
What should you confirm with the City before you budget?
- How the City will treat the first unit, and whether a 60-month redevelopment credit applies.
- How every garden or laneway suite will be counted for development charges and, separately, for parkland.
- Whether education development charges apply, and whether your units are non-rental or rental for payment timing.
- Whether the Development Charges Reduction Program applies once its funding agreement is in place.
- That the parcel will have no more than six residential units under the development-charge rule you are relying on.
A free initial consultation is a good time to sort that package before drawings go too far.
Frequently asked questions
Do I pay development charges on a fourplex in Toronto?
City development charges are not imposed on the second, third or fourth unit, provided no more than six residential units are built on the parcel. The first unit is still charged unless another exemption or a redevelopment credit applies. Ask the City how it will treat your lot.
Does the exemption still apply if my lot has seven units?
Not under By-law 845-2025 as written. That rule applies where a parcel has no more than six units, with a deferral-agreement garden or laneway suite left out of the count. For parkland only, By-law 269-2026 allows seven units where one or more units is a garden or laneway suite. Check both.
Where is the by-law text I can show my lender or designer?
Start with By-law 845-2025, By-law 269-2026 for parkland, Chapter 415, and the Development Charges Act, 1997, using the official source links below. The City's overview is a useful summary, but the by-law governs.
When do I have to pay?
For non-rental residential development, the City says charges must be paid in full before occupancy is granted, effective November 3, 2025, unless a Section 27 agreement says otherwise. Rental housing follows a different instalment schedule.
Do Markham or Richmond Hill use Toronto's exemption?
No. Each municipality has its own development charges by-law. Toronto's six-unit exemption does not travel with you to another city.