Mississauga, Peel Region

Custom homes and renovations in Mississauga

Kings Valley Homes builds custom homes and takes on whole-home renovations, additions, basements and additional residential units for Mississauga homeowners. One design-build team coordinates design, permits and construction. From Port Credit to Streetsville, the first step is a free consultation. Call (647) 278-2494.

One team for design, permits and construction

Grand foyer with a sweeping staircase, ornate metal railings and marble flooring

Services in Mississauga

What we build and renovate in Mississauga

Home additions in Mississauga: second-storey and rear additions

Kings Valley Homes designs, permits and builds home additions in Mississauga: second-storey additions on bungalows and one-and-a-half-storey houses, rear additions that open up the main floor, and side additions where the lot allows. One team checks your zoning, prepares the drawings and the permit application through the City's ePlans portal and builds the addition. Call (647) 278-2494 for a free consultation.

Which addition fits your house

  • Second-storey addition. A new floor goes on top of the existing house. The key questions are whether the foundation and walls can carry it, the height limit for your zone, and where the new stair lands.
  • Rear addition. A new foundation and floor extend the back of the house. The key questions are the rear setback, lot coverage, grading and drainage, and any trees in the yard.
  • Side addition or bump-out. It's limited by the side setback and by how close windows can be to the property line.

Many projects combine two of these, or pair an addition with a basement or additional-unit plan. A feasibility review is how you find out what your lot allows.

What Mississauga checks before it issues a permit

  1. A building permit is required. Mississauga lists "addition to an existing building" among projects that need a permit. Related work in an addition often needs one too: dormers, roof changes that raise the height, new or enlarged windows and doors, underpinning, and moved plumbing fixtures.
  2. Zoning comes first. An addition must meet the zoning rules for your zone: permitted dwelling type, setbacks to property lines, lot coverage, height and maximum floor area, plus the general provisions in Part 4 of the Zoning By-law. City zoning staff confirm this when they review your permit application.
  3. Other approvals may come before the permit. Depending on the property, these can include Site Plan Approval (if your property is in a Site Plan Control area, the permit can't be issued until site plan approval is granted), conservation authority approval (Credit Valley Conservation, Conservation Halton or TRCA), heritage approval, a tree permit, and Committee of Adjustment approval if the design doesn't meet zoning. The City's Applicable Law Form records which apply.
  4. Trees. In Mississauga, injuring or removing a tree on private property with a diameter of 15 cm or more needs a permit.
  5. The permit package. For an addition, the City asks for the Applicable Law Form, ventilation and energy (SB-12) forms, designer information, and a site plan and floor plans with structural framing, smoke and carbon monoxide alarm locations, and existing and proposed plumbing. Drawings are submitted online through ePlans.

How long the permit takes in Mississauga

The City says prescreening usually takes 7 to 10 business days. The first review of a complete residential application may take 10 business days. Each resubmission can add two or more weeks. Its published average for a residential alteration (detached or semi) is 7 weeks from application to permit. An incomplete application takes longer, so we put the package together carefully before it goes in.

Construction time depends on size, structure and whether it's a second storey or a new foundation. We give you a property-specific schedule after the feasibility review.

What drives the cost of an addition

  • Size and footprint, and whether it's a second storey or a rear addition
  • Foundation and structural reinforcement of the existing house
  • Tie-in to the existing roof, walls and services (heating and cooling capacity, plumbing, electrical)
  • Approvals beyond the permit: site plan, conservation, tree or minor variance
  • Windows, finishes and the energy-code path chosen

We don't publish package prices. A free consultation is the right place to talk through scope.

Sources (City of Mississauga, checked 2026-11-11): When a building permit is required · Zoning: additions and new houses · Building permit application process · Drawings and documents: addition · Building permit cost and time frames · Site Plan Control By-law · Tree permits · Committee of Adjustment

Local context

Building in Mississauga: what shapes the plan

Mississauga's Official Plan sets out 23 Neighbourhood Character Areas, and the rules can differ by area. In Clarkson-Lorne Park and Mineola, for example, the plan's infill housing policies for detached dwellings on lands identified in the Site Plan Control By-law aim to preserve generous yards, existing grades and drainage, and mature vegetation, to keep garages recessed or behind the front of the house, to limit overshadowing of neighbours and to encourage one- to two-storey buildings. Port Credit has its own character-area policies. Trees of a certain size on private property are protected by the City's Private Tree Protection By-law 0021-2022, and properties near creeks, valleys, wetlands or the lakeshore may also need a Credit Valley Conservation permit.

Mississauga permits up to two additional residential units (ARUs) on a lot with a detached, semi-detached or townhouse dwelling: two attached units, or one attached unit plus one detached garden suite, and only one garden suite per lot. Under Zoning By-law 0225-2007, section 4.1.1, no extra parking is required for an ARU, a lot with ARUs can have only one driveway, and a detached ARU cannot be taller than the main dwelling. Which zones allow which configuration varies, and the City says building permit fees are refunded when building or legalizing ARUs, with second and third units exempt from most municipal charges. Confirm the current terms for your lot before relying on them.

Building permits are issued by the City of Mississauga, which reviews drawings for zoning, Ontario Building Code and other applicable law. Units beyond two in one building trigger additional Building Code requirements that affect design. We start each Mississauga project with the property so you know what's realistic before paying for full drawings.

Neighbourhoods we serve in Mississauga

  • Port Credit
  • Lakeview
  • Clarkson
  • Lorne Park
  • Mineola
  • Cooksville
  • Erindale
  • Streetsville
  • Meadowvale
  • Erin Mills
  • Malton

Why Kings Valley Homes

Why work with Kings Valley Homes in Mississauga

  • One design-build team for drawings, permits and construction, so infill, tree or conservation feedback goes straight back into the design.
  • One team for design, permits and construction
  • Real Kings Valley Homes project photography in our gallery, not stock renderings.
  • No package pricing. We price your actual scope after a consultation.
  • Garden suites and basement units designed with Building Code and zoning limits checked up front.

Kings Valley Homes is registered with WSIB.

See real work in the project gallery.

Mississauga questions

Quick answers.

Can I build a garden suite or basement apartment in Mississauga?

Yes, on many lots. The City permits up to two ARUs with a detached, semi-detached or townhouse dwelling, either two attached units or one attached plus one detached garden suite, subject to zone, height, coverage and setback rules. Kings Valley Homes checks your zoning before design starts.

Do I need a permit for a basement apartment in Mississauga?

Yes. Adding units requires a building permit and drawings showing compliance with zoning and the Ontario Building Code.

Do trees or conservation rules affect my project?

They can. The Private Tree Protection By-law protects larger private trees, and sites near regulated creeks, valleys or the shoreline may need a Credit Valley Conservation permit. We check both during the early property review.

How long does a project take in Mississauga?

It depends on design, approvals and size. A minor variance, tree permit or conservation permit adds time, so Kings Valley Homes gives a project-specific schedule after reviewing your property.

How much does a renovation or custom home cost in Mississauga?

We don't publish package prices because cost depends on size, structure, finishes, systems and site conditions. After a free consultation we can talk through your scope and what will drive your budget.

Do I need a permit for a home addition in Mississauga?

Yes. The City of Mississauga requires a building permit for an addition to an existing building, and zoning staff check the addition against your zone's setbacks, lot coverage, height and floor area rules during the permit review. Some properties also need site plan, conservation, heritage or tree approvals first.

How long does an addition permit take in Mississauga?

The City says prescreening usually takes 7 to 10 business days and the first review of a complete residential application may take 10 business days, with each resubmission adding two or more weeks. Its published average for a residential alteration is 7 weeks.

Related reading

Book a free consultation

Free consultation

Planning a build or renovation in Mississauga?

Tell us the address, what you want to build and your timing. Call (647) 278-2494 or email info@kingsvalleyhomes.ca.