Build from the ground up

Custom Home Builder in Toronto, Markham, Richmond Hill & Vaughan

Kings Valley Homes builds custom homes in Toronto, Markham, Richmond Hill, Vaughan, and nearby GTA communities. One team coordinates your lot and concept, design, permits, selections, and construction from the first conversation to the finished home.

One team for design, permits and construction

Grand foyer with a sweeping staircase, ornate metal railings, and marble flooring

Kings Valley Homes is registered with WSIB.

Who it is for

Custom home construction across the GTA

This service suits homeowners who have a lot or teardown property in the GTA and want a home designed specifically for their family, rather than a production build. It also fits those planning a full rebuild who want one team managing design, permits, and construction together.

How the work proceeds

How a custom home build in Toronto runs, step by step

01

Consultation & site review

We visit your property or lot to discuss goals, budget, and any site constraints.

02

Design & drawings

Our design team develops floor plans and elevations that reflect how you want to live.

03

Permits & approvals

We prepare and submit the drawings required for municipal permits and approvals.

04

Construction

Our crews and trades build the home according to the approved plans and schedule.

05

Final walkthrough & handover

We complete a final walkthrough with you before handing over the finished home.

Timeline

What affects a custom home build timeline in Toronto

Custom home projects typically run from twelve to twenty-four months, depending on size and complexity. Design and permitting usually take three to six months, while construction can take nine to eighteen months. Municipal review timelines, your selection choices for finishes, and site conditions such as soil or grading can all move these dates.

What affects cost

What drives custom home building cost

  • Lot size and grading
  • Home size and layout complexity
  • Material and finish selections
  • Municipal permit requirements
  • Structural and foundation conditions

We do not publish package prices. A free consultation is the right place to talk through scope before anyone suggests a number.

How long does it take to build a custom home in Toronto and the GTA?

There is no single honest number. A custom home moves through design, engineering, permit review and then construction. Lot conditions, size, finishes and any zoning relief, such as a minor variance, all change the schedule. We give a project-specific timeline after reviewing your lot.

Sources: https://www.toronto.ca/city-government/planning-development/committee-of-adjustment/

Do you handle permits and municipal approvals for a custom home?

Yes. We coordinate zoning checks, drawings and the building permit application with the same team that builds the home. If the design needs relief from zoning, a minor variance from the Committee of Adjustment comes first. The municipality decides approvals, and a new house needs a building permit.

Sources: https://www.toronto.ca/services-payments/building-construction/building-permit/before-you-apply-for-a-building-permit/when-do-i-need-a-building-permit/ · https://www.toronto.ca/city-government/planning-development/committee-of-adjustment/

Should I renovate, add on or rebuild?

Renovate when the structure is sound and the layout can work. Add on when you need more space and zoning allows it. Rebuild when the house is past saving or the lot is better served by a new design. We review the lot, the existing structure and zoning first, then tell you which route fits.

A custom home is a sequence of decisions made in the right order. Site and zoning come first, then design, then engineering and approvals, then construction. Done in that order, the build is calm. Done out of order, it is expensive. This section explains what happens at each stage, which rules apply in Ontario, and where the real schedule risks sit.

Who a custom build suits

A custom build suits an owner with a lot, a teardown, or a decision to rebuild who wants the house designed around a specific household rather than selected from a catalogue. It is also the right route when the site is unusual: a narrow infill lot, a slope, a ravine edge, or a lot with mature trees that shape the plan.

It is a heavier undertaking than a renovation. It carries its own licensing, warranty and approval requirements, covered below, so it is worth understanding them before you sign anything with any builder.

What happens at each stage

  1. Site review and brief We walk the lot and read the constraints that decide the house before a line is drawn: zoning, setbacks, lot coverage, height, easements, grade, existing services, mature trees and any conservation or heritage overlay. You describe how the household lives. The output is a clear brief and a list of questions to settle first.
  2. Design and drawings Floor plans, elevations, sections and structural direction are developed together so the house you approve can actually be built within the rules. Selections that affect structure or rough-in, such as window sizes, ceiling heights, stair locations, heated floors and wiring for smart-home or security systems, are decided here, not during framing.
  3. Zoning review and approvals Before a building permit application, the design is checked against the zoning by-law. If it needs relief, the Committee of Adjustment hears a minor variance application first. Tree protection, conservation authority permits and demolition control are cleared in parallel where they apply.
  4. Permit and construction With a complete permit application accepted and the permit issued, construction proceeds in the standard sequence: excavation and foundations, framing, mechanical and electrical rough-in, insulation, then interior finishes, with municipal inspections at each mandatory stage.
  5. Completion and handover Final inspections close the permit. We walk the finished house with you, document items to complete, and hand over the information you need to operate and maintain it. Your warranty coverage begins when you take possession.

Licensing and warranty: check these first

In Ontario, anyone who builds a new home for you on your land must be licensed by the Home Construction Regulatory Authority (HCRA) as a builder and vendor. The home must also be enrolled in Tarion's warranty program, and Tarion's enrolment confirmation must be in place before the construction contract is entered into and before construction starts.

These are legal requirements, not marketing points. Ask any builder you consider for their HCRA licence number and the Tarion enrolment details for your home, and verify both on the public registers before you sign.

An owner who builds a home for their own use may not need a licence, but an owner-built home is not covered by the statutory new-home warranty and the owner takes on the builder's role, including permits, safety and trade contracts.

Tarion's warranty is time-based. In broad terms, the first year covers workmanship, materials and Building Code violations; the second year adds water penetration, the building envelope and the electrical, plumbing and heating systems; years three to seven cover major structural defects. Read the current Tarion documents for exact definitions and exclusions.

Permits, codes and approvals

The main approvals for a new house in Toronto are below. Other GTA municipalities follow the same Ontario framework with local differences.

  • Building permit under the Building Code Act, 1992 and the Ontario Building Code. Since January 1, 2025 the 2024 Building Code (O. Reg. 163/24) applies and replaces O. Reg. 332/12.
  • Zoning compliance. A Zoning Review or Applicable Law Certificate before applying is recommended; relief goes to the Committee of Adjustment as a minor variance, which must meet the four tests in Planning Act s. 45(1).
  • Energy efficiency under Supplementary Standard SB-12, with an energy efficiency design summary filed with the permit application.
  • Tree protection. On Toronto private property, trees 30 cm or more in diameter are protected and a Tree Declaration is required with permit applications where damage is possible.
  • Demolition. In Toronto a demolition permit is generally withheld until a permit for the replacement building is issued. Properties on a heritage register carry extra notice or approval steps.
  • Conservation authority permission under O. Reg. 41/24 where the lot is in a regulated area, obtained before the building permit.
  • Electrical work is notified through the Electrical Safety Authority by a licensed electrical contractor. Gas work is done by TSSA-certified gas technicians.
  • Qualified designer. The permit drawings must be prepared by a person with the required Building Code qualification (BCIN), a licensed architect or a professional engineer, unless an owner exemption applies.

Energy efficiency and the building envelope

Ontario kept SB-12 in the 2024 Code. It sets three ways to comply: prescriptive compliance packages, a performance (modelling) path, or certification to a recognized program. The prescriptive packages are selected by climate zone and heating system, and set minimums for insulation, windows and doors, heat recovery ventilation and water heating.

Each dwelling unit requires a heat recovery ventilator. The prescriptive path is available when the window and glazed-door area is 22% or less of the above-grade wall area; above that, the performance path is required. An airtightness test is optional but lets a designer trade certain package requirements if the target is met. New houses also need a rough-in for sub-slab depressurization (radon).

These are minimums. Many households choose to exceed them for comfort and running cost, and the time to decide is during design.

What shapes the timeline

The timeline is set less by the construction crew than by the order of decisions and approvals. The items that move it most:

  • Zoning outcome. A design that meets the by-law proceeds straight to permit. A minor variance adds a hearing cycle before the building permit application can be approved.
  • Statutory review period. For a complete application, the Building Code sets a maximum review period of 10 business days for a house with no dwelling unit above another, and longer for other classes. Incomplete applications and zoning or applicable-law issues sit outside that clock.
  • Approvals outside the building permit: conservation authority, tree permits, heritage and demolition control.
  • Engineering and site conditions: soil, water table, and neighbouring foundations.
  • Selections. Long-lead items such as windows, custom millwork and specialty finishes should be ordered against the schedule, not after it.
  • Weather and the winter sequence for excavation and concrete.

What drives cost

Cost follows decisions, not square footage alone. We do not publish package prices; a free consultation is where scope is discussed. The drivers, in rough order of influence:

  • Site conditions: grade, soil, groundwater, access, and services to connect.
  • Size, number of storeys and the complexity of the shape and roofline.
  • Structural and envelope design: spans, large openings, window area, insulation level.
  • Mechanical, electrical and the integration of smart-home, heated-surface and security systems.
  • Finishes and selections, which are the largest source of variation after the structure is fixed.
  • Approvals and professional services required by the site.
  • Change after approval. Late changes touch drawings, permits and trades at once.

Contracts, payment and holdback

Ontario's Construction Act governs how payment works on construction projects. In brief: owners generally retain a 10% holdback on payments for lien purposes; proper invoices are payable within 28 days unless a notice of non-payment is given within 14 days; and lien rights have strict deadlines. A written contract should state scope, the payment schedule, how changes are priced and approved, and how selections allowances are handled. Have your lawyer review it.

Questions worth asking any builder

  • Can I see your HCRA licence and the Tarion enrolment for my address?
  • What does the contract say about changes, delays, allowances and payment?
  • Who is responsible for permits, inspections and closing the permit?
  • How are selections deadlines set against the schedule?
  • Who is on site, who do I call, and how often will I get an update?

More questions, answered

Do I need an architect for a custom home?

Not always. In Ontario, building designs must be prepared by a designer holding the required Building Code qualification (BCIN, which you can verify in the province's QuARTS registry), a licensed architect, or a professional engineer, depending on the project. Complex sites, heritage or site plan requirements, or the design itself can make an architect or engineer the right choice. We will tell you at the first consultation what your lot requires.

What is the difference between a building permit and zoning approval?

Zoning decides what you may build on the lot: use, height, setbacks, coverage. The building permit confirms the design meets the Building Code and applicable law. A building permit cannot be issued for work that contravenes zoning, so a minor variance, where needed, is obtained first.

Can I demolish my existing house before the permit is issued?

In Toronto, demolition control generally withholds a demolition permit until a building permit for the replacement house has been issued. Properties on the heritage register have additional steps. Confirm with your municipality before scheduling any demolition.

What is a minor variance?

It is a small relief from a zoning rule, such as a setback or height, granted by the Committee of Adjustment. It must meet four tests under the Planning Act: minor, desirable for the appropriate use of the land, in keeping with the intent of the zoning by-law, and in keeping with the intent of the Official Plan.

What energy standard must a new house meet?

Ontario's Supplementary Standard SB-12 in the 2024 Building Code. It offers prescriptive compliance packages, a performance path, or certification under recognized programs, and requires a heat recovery ventilator in each dwelling unit.

Is my new home covered by a warranty?

A new home built by a licensed builder under contract must be enrolled in Tarion's warranty program. Coverage runs from the possession date: one year, two years, and seven years for major structural defects, with defined exclusions. Owner-built homes are not eligible.

How do inspections work?

The builder must notify the municipality at each mandatory stage, including footings, foundations, framing with rough-in, fire separations, insulation and vapour barrier, and the final. In Toronto, inspections are booked online and are conducted on weekdays. Work covered before inspection may have to be uncovered.

Do you handle permits for me?

Yes. Preparing and submitting the permit package and coordinating the municipality's questions is part of every build. The municipality, not the builder, decides whether a permit is issued.

Sources

Regulatory details checked against the sources below in October 2026. Municipal rules change; we confirm current requirements for your address during your consultation.

Planning a custom home? Talk it through with us.

Questions about this service

Quick answers.

Who is a custom home builder in Toronto, Markham and Richmond Hill?

Kings Valley Homes builds custom homes in Toronto, Markham, Richmond Hill, Vaughan, and nearby GTA communities. One team coordinates your lot and concept, design, permits, selections, and construction from the first conversation to the finished home. Book a free consultation at (647) 278-2494.

Do you handle permits and municipal approvals?

Yes, we manage the permit process as part of every custom home project, preparing drawings and documentation for submission to the local municipality. We coordinate directly with building officials throughout review and keep you updated on progress, so you do not need to navigate the approvals process on your own.

How long does building a custom home take?

Timelines vary by project. Design, permitting, municipal review and your selection decisions all affect the schedule. Construction makes up the majority of the work after permits are in place. We discuss a realistic sequence for your lot in a free consultation rather than treating any one range as a guarantee.

Can I make changes once construction begins?

Some changes can be accommodated once construction starts, though changes to structural elements or approved permit drawings may require additional review and can affect the schedule. We recommend finalizing major decisions during the design and selections phase to keep the project moving smoothly and avoid delays.

Which areas do you build custom homes in?

We build custom homes throughout the Greater Toronto Area, including Markham, Toronto, Richmond Hill, Vaughan, Newmarket, and Aurora. If you have a lot or teardown property in one of these communities, we would be glad to discuss your project and walk you through what building a custom home involves.