A home addition extends your existing house, whether through a rear addition that expands your main floor or a second-storey addition that adds bedrooms and living space above. We build additions for homeowners in Markham, Toronto, Richmond Hill, Vaughan, Newmarket, and Aurora. Call (647) 278-2494 for a free consultation.
One team for design, permits and construction

Building in Mississauga? See home additions in Mississauga.
Who it is for
The right brief, before the first drawing.
This service suits homeowners who need more space, such as an additional bedroom, bathroom, or living area, but want to stay in their current home and neighbourhood. It also fits those whose lot allows for a rear addition or supports adding a second storey.
How the work proceeds
How a home addition or second storey runs, step by step
Consultation & feasibility
We assess your property and existing structure to determine what an addition can achieve.
Design & engineering
We develop drawings and structural plans for the addition, tying it into your existing home.
Permits & approvals
We prepare and submit the documentation required for municipal permits.
Construction
Our trades build the addition, from foundation or structural tie-in through to finishes.
Final walkthrough
We complete a final walkthrough to review the finished addition with you.
Timeline
What affects a home addition timeline in Toronto
Additions typically take six to fourteen months from design through completion, depending on size and whether the project involves a second storey or new foundation work. Municipal review timelines, structural engineering requirements, and site conditions such as existing foundation capacity can all affect the overall schedule.
What affects cost
What drives home addition cost
- Addition size and footprint
- Structural and foundation requirements
- Second storey versus rear addition
- Material and finish selections
- Existing home tie-in complexity
We do not publish package prices. A free consultation is the right place to talk through scope before anyone suggests a number.
An addition is the one renovation that changes the building envelope, the lot and the structure at the same time. The sequence is therefore feasibility first, then zoning, then engineering, then permits. This section explains each step and where the decisions are made.
Rear addition, second storey or side addition
The three common types differ in what they ask of the existing house.
- Rear addition: a new foundation and floor system attach to the back of the house. The key checks are the rear setback, lot coverage and the tie-in to the existing structure.
- Second-storey addition: a new floor is built above the existing one. The key checks are whether the existing foundation and walls can carry it, the building height limit and how the stairs and mechanical systems connect.
- Side addition: the house is extended sideways, constrained by the side setback and by how close windows are to the property line.
Often the best answer combines them, or uses an addition to make a basement or main-floor change possible. A feasibility review is how you find out which works on your lot.
Zoning comes first
Your municipality's zoning by-law decides how large an addition can be, regardless of the Building Code. In Toronto, Zoning By-law 569-2013 regulates items such as building height, lot coverage, floor space index, setbacks, angular planes and soft landscaping. We read these against your survey before design starts.
When the design does not meet a zoning standard, a minor variance can be requested from the Committee of Adjustment. The Planning Act (s. 45(1)) requires that the variance be minor, desirable for the appropriate development of the property, in keeping with the general intent of the zoning by-law, and in keeping with the general intent of the official plan. Toronto also offers a Zoning Applicable Law Certificate, a preliminary zoning review done before the permit application, so surprises show up early.
Other approvals may apply. Properties within conservation authority regulated areas, such as TRCA, need that authority's permit before a building permit is issued. Toronto protects trees 30 cm in diameter or more on private property, so the design has to work around them.
Structure and the existing house
An addition has to be tied into a house that was built to different standards. Engineers resolve this on drawings.
- Foundation. The new foundation must bear on suitable soil below frost depth and be compatible with the existing one. A second storey may need foundation reinforcement.
- Floor and wall framing. New loads are traced down to the foundation, which can require beams, posts and reinforced walls.
- Roof. A second storey usually means removing the roof, which is why work is planned around weather protection.
- Openings. Windows near a property line are limited by the spatial separation rules of the Building Code, which affect window size and wall construction.
- Connection of services. Heating and cooling capacity, plumbing and electrical service are checked against the added floor area.
Energy and ventilation
Additions must meet the Building Code's energy requirements. Supplementary Standard SB-12 provides compliance packages, a performance path and other methods, and SB-12 specifically addresses additions. The addition's insulation, windows, air sealing and heating are designed to the chosen path. New floor area also needs ventilation: Section 9.32 of the Building Code sets requirements for principal and supplemental exhaust, and the new space is assessed against them.
How an addition project runs
- Feasibility We review the survey, zoning, the existing structure and what you want, and give you a view of what is achievable.
- Design We develop plans and elevations so the addition looks like part of the house from the street and works inside.
- Engineering Structural drawings and any required reports are prepared.
- Zoning and permit Zoning compliance is confirmed, or relief is sought, and the building permit application is submitted.
- Site preparation Protection, tree protection, utility locates and temporary weather protection.
- Foundation and framing The foundation is built and inspected, then framing, roof and sheathing.
- Mechanical, insulation and finishes Plumbing, heating, electrical and insulation go in and are inspected, then drywall and finishes.
- Final inspection and handover The permit closes after the final inspection, and we walk the finished addition with you.
Toronto inspections follow the stages of the work, and the builder gives notice at each one. Work that is covered before inspection may have to be uncovered, so we do not close anything ahead of its inspection.
What shapes the schedule
Beyond the general range quoted on this page, the timeline is set by:
- Whether a minor variance is needed, and how long the Committee of Adjustment process takes.
- Permit review. A complete application for a house has a legislated review period under the Building Code. An incomplete one pauses the clock.
- Foundation scope, including excavation, soil and weather.
- Lead times for windows, trusses and specialty products.
- How much of the existing house is disturbed, such as removing the roof for a second storey.
- Your decisions: finalising the plan before framing begins avoids the biggest delays.
What drives cost, without a number
Addition cost follows structure more than floor area.
- Foundation and excavation requirements.
- A second storey versus a ground-level addition, and any reinforcement of the existing structure.
- Roof complexity and the extent of exterior tie-in.
- Mechanical and electrical upgrades.
- The kitchen or bathroom within the addition, which concentrates cost in a small area.
- Exterior finishes that match the existing house.
We discuss scope with you at a free consultation before anyone suggests a number.
More questions, answered
More questions, answered
Do I need a permit for an addition?
Yes. Toronto requires a building permit for additions, including second or third storey additions, attached garages, sunrooms, porches and decks over 60 cm above grade. Zoning applies as well.
How big can my addition be?
It depends on your lot. Toronto's by-law sets limits on building height, lot coverage, floor space index and setbacks. We check these against your survey, and a minor variance can be requested where a standard is not met.
Can my foundation support a second storey?
Only an engineer can answer that after reviewing the existing foundation, walls and soil. Sometimes reinforcement is required, and sometimes a rear addition is the better option.
What is a minor variance?
It is a small zoning relief granted by the Committee of Adjustment if the Planning Act's four tests are met. It is a public process, and neighbours are notified.
Do I have to move out?
It depends on the scope. A rear addition is often built with minimal impact on the existing house until the tie-in. A second storey disturbs more, because the roof is removed, and many households choose to relocate for that phase.
Will it match my house?
We design to continue roof lines, window proportions and exterior materials so that the addition reads as part of the original house, though a slightly different shade of old brick or siding can be unavoidable.
Sources
Regulatory details checked against the sources below in October 2026. Municipal rules change; we confirm current requirements for your address during your consultation.
Planning an addition or second storey? Call us about your home.
Questions about this service
Quick answers.
Who does second-storey and rear additions in Toronto, Newmarket, Markham and Richmond Hill?
Kings Valley Homes builds rear additions and second-storey additions for homeowners in Toronto, Markham, Richmond Hill, Vaughan, Newmarket and Aurora. We start with zoning, the existing foundation and structure, and the municipal permit requirements. Call (647) 278-2494 for a free consultation.
Do additions require municipal permits?
Yes, additions require municipal building permits, and larger projects may also involve zoning review depending on your property and the size of the addition. We prepare and submit the required documentation and manage communication with the municipality throughout the review and approval process on your behalf.
Can our existing foundation support a second storey?
It depends on the condition and design of your existing foundation and structure, which we assess during the feasibility stage of a project. In some cases, reinforcement is needed before a second storey can be added, and our design and engineering team will identify what your home specifically requires.
Will the addition match our existing home?
We design additions to tie in with your home's existing structure, rooflines, and exterior finishes wherever possible, so the result reads as one cohesive building rather than a visibly separate addition. Material availability and your existing home's construction details are both factored into that design process.
What areas do you build additions in?
We build rear additions and second-storey additions for homeowners throughout Markham, Toronto, Richmond Hill, Vaughan, Newmarket, and Aurora. If you are considering adding space to your current home, our team can assess your property and discuss what options are feasible for your lot.
Related services
- Custom home building — design-build custom homes, from lot review through permits and construction.
- Home renovation — whole-home renovations in Toronto and the GTA.
- Design, permits and project management — coordinated design, approvals and construction management.
- Basement underpinning — basement lowering and underpinning.
Book a free consultation
Free consultation
Book your free addition consultation
Call (647) 278-2494 or email info@kingsvalleyhomes.ca. Tell us the municipality, the property, and what you want the home to do next.