Bathroom Renovations in Toronto & the GTA
A bathroom renovation updates the layout, fixtures, tile, and finishes of your bathroom, from a simple refresh to a full reconfiguration involving plumbing and structural changes. We complete bathroom renovations for homeowners across Markham, Toronto, Richmond Hill, Vaughan, Newmarket, and Aurora. Call (647) 278-2494 for a free consultation.
One team for design, permits and construction

Who it is for
The right brief, before the first drawing.
This service suits homeowners with a bathroom that feels dated, cramped, or in need of updated plumbing and fixtures. It also fits those adding a new bathroom or reconfiguring an existing one to improve layout and storage.
How the work proceeds
How a Toronto bathroom renovation runs, step by step
Consultation & assessment
We review your existing bathroom and discuss layout and finish preferences.
Design & selections
We finalize fixtures, tile, and finishes based on your goals and space.
Permits (if required)
We arrange permits for any plumbing or structural changes involved.
Demolition & construction
Our trades complete demolition, plumbing, tiling, and installation in sequence.
Final walkthrough
We review the finished bathroom with you and address any final details.
Timeline
What affects a bathroom renovation timeline in Toronto
Bathroom renovations typically take three to eight weeks, depending on whether the layout is changing and how much tile and plumbing work is involved. Material lead times for tile and fixtures, your selection decisions, and any required permits can extend the schedule beyond initial estimates.
What affects cost
What drives bathroom renovation cost
- Layout and plumbing changes
- Tile selection and coverage
- Fixture and vanity choices
- Waterproofing and structural work
- Ventilation and electrical updates
We do not publish package prices. A free consultation is the right place to talk through scope before anyone suggests a number.
A bathroom is a small room that has to keep water out of a house for decades. What makes one last is largely invisible: the plumbing, the waterproofing, the ventilation and the order they go in. This section explains how a bathroom renovation is built and which rules apply.
Refresh, reconfigure or add
Bathroom projects fall into three groups, and the difference drives permits, trades and sequencing.
- Refresh: fixtures, vanity, tile and finishes are replaced where they are. Repairing and replacing plumbing fixtures does not need a building permit in Toronto.
- Reconfigure: the tub, shower, toilet or vanity moves, or the room is enlarged. Drains, vents, supply lines and floor framing change, which is plumbing modification and structural work.
- Add: a new bathroom, for example in a basement or an addition. This brings drainage, venting, ventilation and often a rough-in below the slab, as well as zoning and permit review.
Waterproofing is the real work
Most bathroom failures are water failures. The tile is the finish. The waterproofing behind and under it is what protects the house.
- Substrate. Walls and floors in wet areas are built to take a bonded waterproofing system rather than relying on grout and sealer.
- Membrane. Sheet or liquid membranes are installed in showers and around tubs, with attention to seams, corners, penetrations and the transition to the floor.
- Slope. The shower floor is sloped to the drain so water does not sit on the surface.
- Testing. Flood-testing a shower pan before tile is installed is a common way to confirm the waterproofing holds before it is covered.
- Penetrations. Niches, valves, benches and glass fixings are the places water most often gets in, so they are detailed on the drawings.
The Building Code and product standards set the baseline, and installation guidance from the manufacturer of the waterproofing system matters as much as the code itself.
Permits and approvals
Toronto's list is clear on plumbing. Installing or modifying heating or plumbing systems requires a building permit, installing a backwater valve requires one, and repairing and replacing plumbing fixtures does not. Adding or removing walls, enlarging openings and structural changes also need a permit. For interior alterations, Toronto asks for a Plumbing Data Sheet and, for heating changes, an HVAC permit; plumbing drawings are not required for one- and two-unit houses.
Beyond the permit itself:
- Ventilation. The Ontario Building Code (O. Reg. 163/24, Section 9.32) calls for supplemental exhaust in a bathroom of 25 L/s, unless the home's principal ventilation fan draws from that bathroom. A fan that moves little air, or that discharges into the attic, is the usual cause of moisture damage.
- Electrical. Receptacles, lighting and any electric heating are installed under the Ontario Electrical Safety Code. A licensed electrical contractor files the notification of work with the Electrical Safety Authority.
- Structure. Moving a tub or a shower base, or creating a curbless shower, can mean altering floor joists, which brings structural drawings.
- Older houses. Houses built before the mid-1980s may contain asbestos in materials such as flooring, plaster or insulation, and testing before demolition is how that is established.
Layout decisions that cannot be fixed later
Several choices are best made on drawings, because each affects what happens in the floor and walls.
- The drain location and the venting route, which decide where a toilet, shower or vanity can go economically.
- Curbless and low-threshold showers, which need the floor structure and drainage detailed for the lower threshold.
- Blocking in the walls for grab bars, shelves and glass, even if you do not install them now.
- Heated floors, which are planned with the electrical or hydronic design, and with the tile and floor build-up.
- Storage, lighting and mirror positions, which depend on rough-in decisions.
How a bathroom renovation runs
- Assessment We inspect the room, the plumbing and the floor, and agree on layout and finish direction.
- Design and selections Fixtures, tile, vanity and finishes are chosen with their rough-in dimensions so that plumbing is installed to the final selections.
- Permits Where plumbing, structure or openings change, drawings and the application are prepared before demolition.
- Demolition and structure The room is stripped, concealed damage is exposed and repaired, and framing or floor changes are made.
- Rough-in and inspection Plumbing, venting, electrical and exhaust are installed and inspected where a permit applies.
- Waterproofing and tile The substrate is built, the waterproofing is installed and tested, and tile is set and grouted.
- Fixtures and finishing Vanity, plumbing fixtures, glass, lighting, accessories and paint go in last to protect them.
- Final inspection and handover The permit closes after the final inspection and we walk you through the finished bathroom.
What shapes the schedule
Beyond the general range on this page, the biggest influences are:
- Tile and fixture lead times, especially for imported tile, custom glass and special-order vanities.
- Cure times for membranes, thin-set and grout, which cannot be rushed.
- Plumbing and structural changes, which add rough-in and inspection steps.
- Concealed conditions such as water damage, rot or old pipes found at demolition.
- Glass shower enclosures, which are normally measured after tile is complete and then fabricated.
What drives cost, without a number
These factors do most of the work on cost.
- Whether the plumbing moves, and how much floor or wall framing changes.
- Tile choice, tile size and the area covered, plus pattern and detailing.
- The vanity, fixtures and glass enclosure.
- Waterproofing complexity, including benches, niches and curbless entries.
- Ventilation and electrical upgrades, including heated floors.
- Concealed repairs discovered during demolition.
We review these during a free consultation, so the scope is clear before anyone suggests a number.
More questions, answered
More questions, answered
Do I need a permit to renovate a bathroom?
Not for a straight replacement of fixtures, which Toronto does not require a permit for. Moving plumbing, changing walls or enlarging openings generally does. Zoning applies regardless, and we confirm what your scope needs.
Why does the exhaust fan matter so much?
Moisture left in the room damages finishes and framing over time. The Building Code sets a minimum supplemental exhaust for bathrooms, and a good installation ducts it outside rather than into the attic.
Can I add a bathroom in the basement?
Yes, subject to zoning, drainage and permits. New plumbing in a basement needs a permit, and drainage may need to be cut into the slab or pumped, depending on the location of the sewer line.
Is a backwater valve part of a bathroom renovation?
It can be. Toronto requires a permit to install one. It protects basement fixtures from sewer back-up and is often considered when basement plumbing is being added or altered.
What is waterproofing, and is it different from tile?
Waterproofing is the membrane system behind and under the tile. Tile and grout are not waterproof on their own, which is why the membrane is installed and tested first.
Can we use our house during the renovation?
Usually, yes, though water is shut off at certain times. If it is your only bathroom, we plan an alternative arrangement with you before work starts.
Sources
Regulatory details checked against the sources below in October 2026. Municipal rules change; we confirm current requirements for your address during your consultation.
Planning a bathroom renovation? Talk to us about scope.
Questions about this service
Quick answers.
How long does a bathroom renovation take?
Most bathroom renovations take three to eight weeks from demolition through final installation, depending on the extent of layout and plumbing changes. Simple refreshes with no layout changes tend to move faster, while full reconfigurations that relocate plumbing or add structural work generally take longer to complete.
Can you move plumbing fixtures to a new layout?
Yes, we can relocate plumbing fixtures such as toilets, sinks, and showers to support a new bathroom layout. Moving plumbing typically adds time and coordination compared to keeping fixtures in their existing locations, so we discuss the trade-offs with you before finalizing the design.
Do you handle waterproofing and tile work?
Yes, waterproofing and tile installation are part of every bathroom renovation we complete, since proper waterproofing is essential to a durable bathroom. We work with experienced tile trades and follow standard waterproofing practices for showers, tub surrounds, and floors throughout the renovated space.
What areas do you renovate bathrooms in?
We renovate bathrooms for homeowners throughout Markham, Toronto, Richmond Hill, Vaughan, Newmarket, and Aurora. Whether you are refreshing an existing bathroom or reconfiguring the layout entirely, our team can meet with you to discuss your space and outline the renovation process.
Related services
- Kitchen renovation — kitchen layouts, cabinetry, finishes and installation.
- Home renovation — whole-home renovations in Toronto and the GTA.
- Basement underpinning — basement lowering and underpinning.
Book a free consultation
Free consultation
Book your free bathroom consultation
Call (647) 278-2494 or email info@kingsvalleyhomes.ca. Tell us the municipality, the property, and what you want the home to do next.