How the work proceeds
How a Toronto home renovation runs, step by step
Consultation & assessment
We walk through your home to understand your goals and assess existing conditions.
Design & planning
We develop a renovation plan and drawings that address layout, structure, and finishes.
Permits & scheduling
We handle any required permits and set a construction schedule before work begins.
Construction
Our trades carry out the renovation in a coordinated sequence to limit disruption.
Final details & walkthrough
We complete finishing touches and review the finished home with you.
Timeline
What affects a home renovation timeline in Toronto
Whole-home renovations generally take four to twelve months, depending on scope and how much structural work is involved. Permitting can add several weeks upfront, and construction is typically the longest phase. Municipal review timelines, your selection decisions on finishes, and unexpected site conditions once walls are opened can all shift the schedule.
What affects cost
What drives home renovation cost
- Scope of structural changes
- Number of rooms involved
- Material and finish selections
- Mechanical and electrical updates
- Existing site or structural conditions
We do not publish package prices. A free consultation is the right place to talk through scope before anyone suggests a number.
Do I need a permit for a home renovation in Toronto?
Often, yes. Toronto requires a building permit for structural changes, additions, new or enlarged windows and doors, plumbing or heating changes, underpinning and new units. Installing cabinetry, repairing plumbing fixtures or replacing a furnace in a house usually doesn't need one. Zoning still applies either way, so confirm your scope with Toronto Building.
How disruptive is a whole-home renovation?
It depends on scope and sequencing. A whole-home renovation coordinates structural, mechanical and finishing work in one plan, which can mean less disruption over time than renovating room by room. Whether you can stay in the house depends on which floors and systems are affected, and we confirm that before work starts.
Do you handle design as well as construction?
Yes. Design, permits and construction run as one project with one team, so drawings, selections, approvals and site work stay in step. The municipality reviews and approves permit submissions, and some work needs engineering. We tell you early which approvals your scope is likely to need.
A whole-home renovation changes how a house works, not just how it looks. That means structure, mechanical systems, layout and finishes are decided together, in the right order, and approved before walls close. This section explains how that is sequenced and where permits, codes and older-house surprises come in.
Deciding what the renovation is
The first decision is scope, because scope sets the permits, the trades, the order of work and how you live in the house. Most whole-home renovations mix three kinds of work.
Each kind of work has its own rules:
- Finish work such as paint, flooring, trim and cabinetry. This usually needs no building permit, but it is sequenced last so it is not damaged by everything else.
- Systems work such as plumbing, heating, electrical and insulation. This is where permits, licensed trades and inspections concentrate.
- Structural and layout work such as removing walls, opening floors, enlarging windows or moving stairs. This needs drawings, often engineering, and a building permit.
A good plan puts structural and systems decisions first. They are expensive to change once they are built, and the finishes you choose later depend on them.
Permits, codes and who reviews what
In Ontario a building permit is required for the construction or material alteration of a building under the Building Code Act, 1992. The Ontario Building Code (O. Reg. 163/24, in force January 1, 2025, replacing O. Reg. 332/12) sets the technical rules. Your municipality issues the permit and inspects the work.
Toronto publishes a plain list of what needs a permit and what does not. These are the items that most often shape a renovation.
- Permit required: adding or removing walls, creating or enlarging a window or door opening, enclosing a porch or deck, finishing a basement where the work includes structural change, new plumbing or heating, underpinning, a separate entrance or a second suite, installing or modifying heating and plumbing systems, installing a backwater valve, installing a fireplace or chimney, and changing a building's use.
- No permit required: replacing a furnace or boiler in a house, repairing and replacing plumbing fixtures, adding or replacing insulation, installing cabinetry and millwork, replacing roofing material when no structural work is needed, waterproofing repairs to a basement, and replacing a window or door in an existing opening in a single-unit house when the opening, its structural support and exits do not change.
Zoning applies whether or not a permit is needed. A permit is not issued if the proposal contravenes applicable law, which includes the zoning by-law. If a renovation changes the building's size or use, the zoning review comes first.
Other approvals can sit alongside the building permit. Electrical work is reported to the Electrical Safety Authority by a licensed electrical contractor. Gas work is done by TSSA-certified gas technicians. Properties near a ravine or watercourse can fall under conservation authority regulation, which needs its own permit before the building permit. Trees of 30 cm in diameter or more on private property in Toronto are protected.
What older houses tend to hide
Renovating an existing house means working with what is behind the walls. Older houses commonly present the same few issues, and the plan should allow for them.
- Hazardous materials. Houses built before the mid-1980s may contain asbestos in materials such as insulation, flooring or plaster. Testing before demolition is how that is established, and it is far cheaper than discovering it mid-job. Ontario's asbestos regulation (O. Reg. 278/05) sets owner and contractor duties on construction projects.
- Framing and structure that does not match the drawings. Walls assumed to be non-structural can carry load, and openings can reveal old repairs. This is why an engineer reviews structural changes.
- Aged wiring, plumbing and heating. Opening walls is the cheapest moment to replace what has reached the end of its life.
- Insulation and air sealing. Walls and ceilings opened for other reasons are the natural time to upgrade them.
None of these is unusual. What matters is that the schedule and the cost conversation make room for them rather than treating each as a surprise.
How the work is sequenced
- Walk-through and measure We assess existing conditions, take measurements and agree what the renovation must achieve.
- Drawings and engineering Plans show the layout; where walls, floors or openings change, an engineer designs and a qualified designer or architect prepares the permit drawings.
- Permit and selections The permit application goes in while fixtures, windows, cabinetry and finishes are chosen, because long lead items need to be ordered early.
- Demolition and protection Work begins with protection of retained areas, then demolition, with hazardous materials dealt with first where testing calls for it.
- Structure, then rough-in Framing and structural work come first, then plumbing, heating, electrical and low-voltage rough-in, with inspections before anything is covered.
- Insulation, drywall and finishes After rough-in inspections, the house is closed up and finished: drywall, flooring, trim, paint, cabinetry, tile and fixtures.
- Final inspection and handover The permit closes after the final inspection, then you walk the home with us and we address the deficiency list.
In Toronto, building inspections are requested online for the next business day and the inspector contacts you the same or the next day. Work that must be inspected cannot be covered up first, so the schedule has to leave room for those stops.
Living in the house, or not
Whether you stay depends on which floors and systems are affected at a given time. Water shut-offs, power interruptions, dust and noise are the things that make a house hard to live in, more than the floor plan itself. Phasing the work by floor or zone is one way to keep part of the house usable, but it can lengthen the overall schedule. We discuss this at the consultation so that the decision is yours, made before work begins.
What shapes the schedule
Beyond the general range quoted earlier on this page, these are the specific things that move a renovation schedule.
- Permit review. Complete applications are subject to legislated review periods, but an incomplete application stops the clock. Drawings that match the zoning by-law and the Building Code on first submission move fastest.
- Lead times. Windows, custom cabinetry, specialty tile and appliances can take longer to arrive than the work takes to prepare for them.
- Concealed conditions. Opening walls and floors can reveal conditions that need an engineer's input.
- Inspection stops. Rough-in work waits for inspection before it is covered.
- Decisions. Late changes to layout or selections after rough-in cost more time than any other single factor.
What drives cost, without a number
Cost follows scope. These are the factors that move a whole-home renovation most.
- The amount of structural change, and whether engineering is required.
- How many rooms and floors are in scope.
- The condition of existing systems, and how much is replaced rather than retained.
- Windows, doors and exterior work.
- Finish level: cabinetry, tile, flooring, fixtures and appliances.
- Whether the house must be vacated and how the work is phased.
A fixed allowance for unknowns is a sensible way to treat concealed conditions in an older house. We talk through scope in a free consultation before anyone suggests a number.
Contracts, holdback and changes
Ontario's Construction Act applies to renovation contracts. Owners generally retain a 10% holdback from each payment, and proper invoices are payable within 28 days unless a notice of non-payment is given within 14 days. Lien rights can be preserved for about 60 days and perfected for about 90 days after the contract is completed or abandoned. Any change to the scope should be written down and priced before the work proceeds.
More questions, answered
More questions, answered
Do I need a permit for a whole-home renovation?
Almost always for some part of it. Structural changes, new or enlarged openings, new plumbing or heating, underpinning and second suites need a building permit in Toronto. Replacing a furnace, repairing fixtures and installing cabinetry generally do not. Each municipality publishes its own list, and we confirm yours at the start.
Can I renovate in phases?
Yes. Phasing can spread the cost and the disruption, but systems and structure are best planned for the whole house first, so early phases do not have to be reopened later.
Do older houses need to be tested for asbestos?
Houses built before the mid-1980s may contain it in some materials. Testing before demolition is how it is established, and we raise it during planning so it does not stall the work later.
Who is responsible for the permit?
As the owner you are ultimately responsible for compliance with the Building Code and zoning. We prepare the application and coordinate it for you and the municipality makes the approval decision.
What if the inspector finds a problem?
The inspector issues an order or notice describing what must change. The work is corrected and reinspected. Work covered before inspection may have to be uncovered, which is why we do not close walls ahead of inspection.
How do you handle changes during the project?
In writing, with the scope and price agreed before the work proceeds. That keeps the project on its own plan rather than on verbal side agreements.
Sources
Regulatory details checked against the sources below in October 2026. Municipal rules change; we confirm current requirements for your address during your consultation.
Planning a whole-home renovation? Start with a call.
Questions about this service
Quick answers.
Who is a home renovation contractor in Toronto and the GTA?
Kings Valley Homes coordinates whole-home renovations across Toronto and the GTA, including layout and structural work, finishes, permits, and project management from planning through construction. We work in Toronto, Markham, Richmond Hill, Vaughan, Newmarket and Aurora. Book a free consultation at (647) 278-2494.
Do you handle design as well as construction?
Yes, we manage design and construction together, so layout decisions, structural changes, and finishes are planned as one coordinated project. This helps avoid conflicts between design intent and construction realities, and keeps the schedule and selections aligned from the start through completion.
Can we stay in our home during the renovation?
It depends on the scope of work and which systems are affected at a given time, such as plumbing or electrical shutdowns. Some homeowners stay throughout, while others relocate temporarily during the most disruptive phases. We discuss what to expect for your specific project during the consultation.
How disruptive is a whole-home renovation?
Whole-home renovations are more disruptive than a single-room project since work happens throughout the house, and many clients choose to live elsewhere during major phases. We sequence the work to keep essential areas usable as long as possible and keep you informed as the schedule progresses.
What areas do you renovate homes in?
We complete whole-home renovations throughout Markham, Toronto, Richmond Hill, Vaughan, Newmarket, and Aurora. Wherever your property is located within these communities, our team can assess your home and outline what a full renovation would involve for your specific layout and goals.
Related services
- Kitchen renovation — kitchen layouts, cabinetry, finishes and installation.
- Bathroom renovation — bathroom layouts, fixtures, tile and installation.
- Basement underpinning — basement lowering and underpinning.
- Smart home automation — smart home automation and heated surfaces.
Free consultation
Book your free renovation consultation
Call (647) 278-2494 or email info@kingsvalleyhomes.ca. Tell us the municipality, the property, and what you want the home to do next.